Dear Friends,
We all are very much excited about Rainier, and quite a few of us have already started working on AX 7.0 (Rainier) technical previews (CTPs). In earlier versions of AX, using Life Cycle Services (LCS) was not a mandate, but now with Rainier, it seems to be a mandatory thing. Thought of sharing few important tips and steps related to integration of Rainier with LCS, for upgrading of codes from AX 2012 -
- As of now, to connect LCS for obtaining the functionalities related to Rainier, one need to have an account on "OnMicrosoft" Azure domain account.
- Project needs to be created in LCS.
- VSO (Visual Studio Online) and LCS needs to be synchronized along with the project and get connected.
- LCS does have a "Code Upgrade" tool, where the model store needs to be uploaded.
- It analyses, upgrades and creates Visual Studio project solutions (normally 2 solutions gets created, one for upgraded objects, and another one for upgrade conflict objects).
- Each solution will have model and layer specific projects.
- As of now, LCS code upgrade facility is available only for AX 2012 codes.
- Developers need to analyze and fix the issues, so as to obtain an error free build.
- BP deviations also needs to be analyzed and needs to be addressed, depending upon the criticality and feasibility of the same.